Updating my 30 Amp sub going to 100A due to growing collection of 240V Equipment.
“CNC Lathe, CNC G0704 Mill, Miller Diversion 180 Tig, Miller 211 Mig, Miller 375 Plasma, Miller LMSW-52T Spot Welder, And 7.5hp Air Compressor! ”
The GE 100A Breakers hard to find around here! 1 breaker For Split Bus the other For a Sub Panel Feed.
The hard part will be running the 1-1-1-3 Cable and Driving Ground Rods.
2 100A GE Breakers (Hard to find around here)
Thanks to a good friend I got the Coil of 1-1-1-3 no local big box stores have 1awg platt etc. wanted me to get a reel!
Right Side, 3rd Down Swapped 60A Split Bus to 100A Max Breaker Load For Sub Section. Will Remove the 30A Heating on the Right side 2nd breaker down and replace with 100A to feed sub panel and Extend with 10awg 3m Scotch Lok’s and Move to the 30A In Red Feeding the existing 30A Garage Sub. While i am at it since the rest of the breakers are 40+ years old will replace with new… Still made in USA!